new production site for sirio elettronica

2020: Sirio 3

Sirio 3 plant has been completed: the new production complex is located in via Volta 2, Bresseo di Teolo (Pd), next to the production site of Sirio 2.

Sirio 3 is a three-floored building. The ground floor, where a brand-new vacuum casting system has been recently installed, is used for manufacturing and for all finished goods warehouse: all shipments take place now from the new stock department.

The second floor is completely dedicated to the Final Inspections department in which Sirio components are 100% tested.

The first floor is ready to set-up new production lines.